Two OR nurses are part of a diverse team that cares for Ebola patients at the Nebraska Biocontainment Patient Care Unit in Omaha, and the team’s nursing director is Shelly Schwedhelm, MSN, RN, a former OR Manager of the Year.
“I chose OR nurses to be on the team because they are experts in PPE [personal protective equipment], aseptic technique, and autoclaving,” Schwedhelm told OR Manager. “Who better to watch and assist you in putting on and taking off your PPE? They do not hesitate to call you out on a break in technique. That’s what OR nurses do every day,” she says.
Schwedhelm also chose nurses from interventional radiology, labor and delivery, the intensive care unit (ICU), the emergency department (ED), and the infusion center.
“You need nurses with different skills,” says Schwedhelm. “The infusion center nurses are indispensible for administering experimental drugs, and the ICU and ED nurses are experts in assisting with central line placement and caring for critically ill patients.”
The 40-member team comprises nurses, care technicians, and respiratory therapists. Respiratory therapists are an important assistant to the registered nurse and are invaluable in airway management. They are very versatile, says Schwedhelm. They can do all of the other roles in the unit except for nursing care. “The group has really clicked from a personality standpoint and has been fabulous from an outcomes perspective,” she says (photo).

Nebraska Biocontainment Patient Care Unit staff at press conference for Rick Sacra, MD. Nursing director, Shelly Schwedhelm, MSN, RN, is on the far right. Used with permission, Nebraska Medical Center, Omaha.
Schwedhelm was in charge of the OR and ED at Nebraska Medical Center, Omaha, until 2008, when she became director of the ED, trauma, and preparedness services, which includes the biocontainment unit.
The Nebraska biocontainment unit is the largest of four such units that opened after the September 11, 2001, attacks as a bulwark against bioterrorism and airborne diseases like SARS (severe acute respiratory syndrome). The other three are Emory University Hospital in Atlanta, St Patrick Hospital in Missoula, Montana, and the National Institutes of Health Clinical Center in Bethesda, Maryland.
The Nebraska Medical Center used more than $1 million of government funds to retrofit a pediatric bone marrow transplant unit to create isolation rooms with concrete-block walls, tornado-proof windows, and a separate air handling system, among other features.
Though Rick Sacra, MD, a missionary, and Ashoka Mukpo, a journalist, were the biocontainment unit’s first patients, the unit has been open since 2005, and the team has been running drills every 3 months since then.
“Sometimes we drill around scenarios of anthrax, sometimes plague, sometimes smallpox, and sometimes viral hemorrhagic fever—the category Ebola falls into. All are a little different, and all require a different unique set of strategies,” says Schwedhelm.
During the years the unit was empty, Schwedhelm says, she ran everything on a “shoestring” budget and all supplies were just-in-time. “We had a medication list, supply list, and equipment list, but until the unit was activated, none of this was stocked in the unit,” she says.
From a leadership standpoint, Schwedhelm says, she and the charge nurse do daily problem solving, make staff adjustments, and ensure that they have a plan for everything from waste disposal to supply delivery to putting patients on dialysis or a ventilator if needed, taking x-rays and electrocardiograms (ECGs), or drawing blood.
“We had developed processes in advance and had many robust policies and procedures, but it isn’t until you activate that you actually see what processes you need and which to tweak, add, or delete,” she says.
In addition to managing the unit, Schwedhelm talks with other hospital leaders who want to set up their own units, and she has offered suggestions to the Centers for Disease Control and Prevention (CDC) about their PPE techniques.
“We are getting hundreds of e-mails and calls, and we can’t get the information out fast enough,” she says. “We are really working hard to teach everyone about our PPE strategies and other logistics and trying to allay anxieties.”
Staff members work 12-hour shifts—five on nights and six on days. At least three on each shift are nurses. One nurse stays in the room with the patient for 3 to 4 hours at a time and rotates with the other nurses. The other two staff members include respiratory therapists or care technicians. They help with PPE donning and doffing, getting supplies, and running the autoclave.
Everyone is cross-trained, and at least one nurse has to be in the room at all times with the patient. If the patient requires a second person in the room, that person can be any of the other staff depending on the acuity of the patient.
There is one staff member in the hall (considered a “dirty” zone) just outside the patient’s room who also wears full PPE. If the nurse in the room needs something, or if something happens in the room, that person can immediately go into the room and help. If this happens, a staff member who is in the clean zone will quickly put on PPE and go into the dirty hall.
The unit has five semiprivate rooms, but Schwedhelm says she believes no more than two to three patients should ever be in the unit at one time because of the amount of autoclaving that has to be done, trash that is generated, and equipment that needs to be managed. All trash and linen are autoclaved.
After the first patient was discharged, the entire unit had to be decontaminated. It was 2 weeks before the second patient arrived. During this time, the staff went back to their other jobs.
“The second patient is gone now, but you can’t imagine the logistics of getting the unit cleaned and processed,” says Schwedhelm.
The day he left, she says, they autoclaved all of the trash and linen, but left the room the way it was. “We let the unit sit for 2 days to let the virus desiccate on its own before we sent our team in to do the cleaning. We don’t assume that all of the virus will be dead, but scientifically we know it’s wise and safer,” she says.
All staff are supervised by a “buddy” each time they don and doff their PPE to ensure they are following proper protocol.
Before staff members enter a patient’s room or the hall outside the room (“dirty” zone), they put on an impervious surgical gown, Crocs covered by surgical booties that come up to the knee, a hood that tucks into the gown, an N95 respirator mask, a full face shield that wraps around the face and neck, and three sets of gloves (photo).
Though the CDC recommends double gloving, Schwedhelm says they triple glove. Staff put on the first pair of gloves as they are donning their PPE. Then long purple Nitrile gloves are put on after donning and duct-taped to the gown. The third pair is put on before entering the patient’s room. “We want them to think of the purple gloves as their skin,” says Schwedhelm.
For example, she says, “after they empty any secretions or do any patient care, they replace the outer pair. They are never without two layers of gloves. The same holds true for the doffing process in that they are never without a pair of gloves that are clean.”
Waterproof aprons also are available to don if the patient has uncontrolled diarrhea and vomiting. However, Schwedhelm notes, if they had such a patient, they would have the staff don coveralls and enhanced PPE.
When staff members exit the patient’s room, they step into the hallway onto a doffing pad. A doffing partner with full PPE watches and assists as all of the PPE is removed in proper sequence and put into an autoclave bag. As staff members take off their foot covers, they step into a clean area of the doffing pad and then walk to the shower, touching nothing along the way. After showering, they leave via a “clean” hallway. The Crocs are dipped in a bleach and water solution.
The doffing partner takes the autoclave bag full of the discarded PPE to the dirty line and hands it off to the person running the autoclave. After the PPE is sterilized, it is taken out on the clean side of the autoclave, put into biohazard boxes, and hauled away to be incinerated.

Morgan Shrader, RN, in full personal protective equipment. Used with permission, Nebraska Medical Center, Omaha.
The CDC’s October 20 update of their guidelines on PPE used by healthcare workers caring for Ebola patients was “dramatic,” says Schwedhelm. “It was almost a complete overhaul,” she says.
The CDC reached out to Nebraska and Emory for input and adopted many of their best practices, such as those for PPE, a “buddy” to help don and doff, and dedicated areas for donning and doffing.
The earlier CDC guidelines were modeled on how Ebola patients in Africa were treated, according to Arjun Srinivasan, MD, associate director for healthcare-associated infection prevention programs at the CDC. Dr Srinivasan spoke during an October 22 live webcast sponsored by the New England Journal of Medicine.
The new guidance is based on the initial experience with caring for Ebola patients in the US and the fundamental principles of the current scientific understanding of Ebola transmission, he says.
“We know there are a lot of unanswered questions and challenges at this point,” says Dr Srinivasan. “One of the big ones is how to manage and handle the evaluation of suspect cases in emergency departments and outpatient settings.”
Schwedhelm noted that the Nebraska Medical Center developed and implemented a new screening tool in the ED almost 2 months ago, and they have now moved it into an electronic format.
The screening tool gives the following prompts to the ED nurse who greets the patient:
• What brings you to the Emergency Department today? (Their chief complaint may be a fever.)
• Have you traveled outside the United States in the last 21 days? If the answer is yes, the next question is: Can you tell me what countries you have been in?
• If any of the countries are in the endemic areas in Africa, the tool prompts an electronic message that tells the nurse what steps to take next.
— Put a mask and gloves on yourself. Provide a mask and gloves for the patient. If the patient needs help walking, put them in a wheelchair.
— Put the patient in a private room.
— Notify the healthcare provider.
On October 13, the American College of Surgeons issued a new surgical protocol for patients with possible or confirmed Ebola. The protocol describes precautions OR personnel (ie, nurses, surgeons, technicians, and anesthesia staff) should take when operating on suspected or confirmed Ebola patients.
Recommendations are made in nine areas:
• training
• patient transport to the OR
• surgical checklist
• OR staff PPE
• surgical drapes
• operative technical considerations, including instrumentation and sharps
• doffing PPE
• specimen and waste management
• OR staff exposure.
The protocol was updated October 21 and will continue to be updated as more data become available.
Speaking at a special panel session at the American College of Surgeons annual meeting in San Francisco on October 27, Sherry M. Wren, MD, FACS, coauthor of the protocol, says when she looked for guidelines on how to perform surgery on patients who might have Ebola, she found nothing. She and Adam L. Kushner, MD, MPH, FACS, a general surgeon with extensive experience operating in developing countries, wrote the guidelines. Dr Wren has also practiced in Africa.
Dr Wren noted that some individuals might wonder why anyone would ever operate on a patient with Ebola. She questions why anybody would deny care to a group of people who were potentially infected with Ebola or had early Ebola symptoms. “To me, it seems ethically not right,” she says.
“We are not talking about elective surgical procedures here,” says Dr Wren. “They should not be performed in patients with suspected or confirmed Ebola. We are talking about emergent or urgent procedures. In these cases, the protocol should be implemented to minimize risk to OR personnel.”
American College of Surgeons. Surgical protocol for possible or confirmed Ebola cases. https://www.facs.org/ebola/surgical-protocol
Centers for Disease Control and Prevention. Guidance on personal protective equipment to be used by healthcare workers during management of patients with Ebola virus disease in US hospitals, including procedures for putting on (donning) and removing (doffing). http://www.cdc.gov/vhf/ebola/hcp/procedures-for-ppe.html
Joint Commission. Ebola preparedness resources. http://www.jointcommission.org/topics/ebola_preparedness_resources.aspx
University of Nebraska Medical Center Ebola videos for donning and doffing. http://app1.unmc.edu/nursing/heroes/